Uploaded image for project: 'Evergreen'
  1. Evergreen
  2. EVG-6955

Add Status of Tests on Master in Patch View

    XMLWordPrintable

    Details

    • Type: New Feature
    • Status: Closed
    • Priority: Major - P3
    • Resolution: Won't Fix
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: None
    • Labels:
      None

      Description

      Currently, on the Patch page, under the "Path Status" we show the status of the tests in the "Base" which doesn't always reflect the status of those tests on master. This means tests failing on the patch could show a green status for the base, but on master those tests are also failing. This then requires me to manually compare the last few builds on master to see if the patch actually broke something or if something external to the patch broke something.

        Attachments

          Activity

            People

            Assignee:
            backlog-server-evg Backlog - Evergreen Team
            Reporter:
            peter.garafano Peter Garafano
            Votes:
            1 Vote for this issue
            Watchers:
            2 Start watching this issue

              Dates

              Created:
              Updated:
              Resolved: