-
Type: Task
-
Resolution: Done
-
Priority: Major - P3
-
None
-
Affects Version/s: None
-
Component/s: None
-
Labels:None
If a test is written with multiple possible topologies, the test runner should split that test up into multiple different ones. This is so that, at the filtering level, the runner will be able to run a test with whichever topology configuration was specified.