[SERVER-58312] Add tests introduced in the past 6 months to the Query Patch Builder Created: 07/Jul/21  Updated: 06/Dec/22  Resolved: 17/Sep/21

Status: Closed
Project: Core Server
Component/s: Testing Infrastructure
Affects Version/s: None
Fix Version/s: None

Type: Task Priority: Major - P3
Reporter: Robert Guo (Inactive) Assignee: Backlog - Server Tooling and Methods (STM) (Inactive)
Resolution: Duplicate Votes: 0
Labels: None
Remaining Estimate: Not Specified
Time Spent: Not Specified
Original Estimate: Not Specified

Issue Links:
Duplicate
Assigned Teams:
Server Tooling & Methods
Participants:

 Description   

Use git history to check for tests introduced in the past 6 months and run those in the query patch builder in addition to the current set of tests.

The rationale for using new tests is that there's a lower probability that these tests are flaky. This came as a request from Query, as we want to fully replace the need for query engineers to run full required patch builds in addition to running this query patch builder variant.