Uploaded image for project: 'Core Server'
  1. Core Server
  2. SERVER-32837

Run jepsen with 2 nodes and an arbiter on branches and storage engines that don't support recoverable rollback

    • Server Tooling & Methods

      This should eliminate the case of two nodes both going into rollback.

            Assignee:
            backlog-server-stm Backlog - Server Tooling and Methods (STM) (Inactive)
            Reporter:
            judah.schvimer@mongodb.com Judah Schvimer
            Votes:
            0 Vote for this issue
            Watchers:
            3 Start watching this issue

              Created:
              Updated:
              Resolved: