Uploaded image for project: 'Core Server'
  1. Core Server
  2. SERVER-40502

Turn off failpoint before shutting down test in ddl_ops_after_prepare_lock_failpoint.js

    • Fully Compatible
    • ALL
    • Repl 2019-04-22
    • 16

      The 'failNonIntentLocksIfWaitNeeded' needs to be turned off after the test is done using it. Otherwise, we risk triggering it during the validation phase.

            Assignee:
            vesselina.ratcheva@mongodb.com Vesselina Ratcheva (Inactive)
            Reporter:
            vesselina.ratcheva@mongodb.com Vesselina Ratcheva (Inactive)
            Votes:
            0 Vote for this issue
            Watchers:
            2 Start watching this issue

              Created:
              Updated:
              Resolved: