Details
-
Task
-
Resolution: Unresolved
-
Major - P3
-
None
-
None
-
None
-
None
-
Service Arch
Description
Run the workload(s) specified in the TDD with the ingress admission control disabled, and with different ingress admission ticket pool sizes, to demonstrate that the ingress admission control can help with server overload.
Attachments
Issue Links
- depends on
-
SERVER-86111 Add IngressAdmissionController to the ingress command path
-
- Needs Scheduling
-
-
SERVER-86112 Limit concurrent operations passing through ingress admission control
-
- Needs Scheduling
-
-
SERVER-86113 Control ingress admission ticket pool via server parameter
-
- Needs Scheduling
-