Uploaded image for project: 'WiredTiger'
  1. WiredTiger
  2. WT-13571

MVP: Control point action "NOP: No operation"

    • Storage Engines

      Implement one control point action that was not included in the POC: "NOP: No operation".

      This is only a minor optional addition to the MVP.

      Note, the control points implementation tickets are in three time periods:

      1. POC - Part of the POC.
      2. MVP - Part of the minimal viable product. However, even the POC can be used but less conveniently than the MVP.
      3. Future - Enhancements after the MVP.

      The title of each ticket starts with the time period.

      Status: Fully defined in the design doc but not implemented. Implementation is quick. It didn't need to be left out of the POC. It was left out of the POC simply because it was last.

            Assignee:
            tod.johnson@mongodb.com Tod Johnson
            Reporter:
            tod.johnson@mongodb.com Tod Johnson
            Votes:
            0 Vote for this issue
            Watchers:
            2 Start watching this issue

              Created:
              Updated: