    • Storage - Ra 2020-06-15
    • 3

      The WiredTiger Evergreen stress test jobs currently run for 24 hours. That gives us good coverage, but means we need to wait a long time to get signal about failures.

      It would be useful to instead run (for example) 4 different jobs each for 6 hours, across different machines. It gives us the same coverage but in 1/4 of the time.