Implement OIDC SASL mechanism

    • Type: Icon: Epic Epic
    • Resolution: Fixed
    • Priority: Icon: Unknown Unknown
    • 5.1.0
    • Affects Version/s: None
    • Component/s: None
    • None
    • Completed
    • Hide
      1. What would you like to communicate to the user about this feature?
      2. Would you like the user to see examples of the syntax and/or executable code and its output?
      3. Which versions of the driver/connector does this apply to?
      Show
      1. What would you like to communicate to the user about this feature? 2. Would you like the user to see examples of the syntax and/or executable code and its output? 3. Which versions of the driver/connector does this apply to?
    • Done
    • OIDC
    • 4
    • 15
    • 16
    • 100
    • Hide

      Engineer: Maxim

      2023-06-23:

      Status Update:

      • Working on getting the async PR merged. Once that's done, we'll pause on this because there are changes to the spec/design being considered. (Note that if no changes are made, we are effectively done, except for that evergreen ticket, which should take about a day.)

      2020-06-08: Updating end date to 2023-06-16

      Status Update:

      • Currently waiting on / working through the latest spec changes. If the changes are minimal, the only thing remaining for the async PR is integration with EVG. If the changes are substantial, we'll have to revisit the timeline for completion
      • Sync is merged into the feature branch

      2023-05-26: Setting target end date to 2023-06-02

      Status Update:

      • OIDC refactoring is done
      • OIDC SASL mechanism in sync
      • OIDC SASL mechanism in async in progress
      • Evg integration is next up

       

      Show
      Engineer: Maxim 2023-06-23: Status Update: Working on getting the async PR merged. Once that's done, we'll pause on this because there are changes to the spec/design being considered. (Note that if no changes are made, we are effectively done, except for that evergreen ticket, which should take about a day.) 2020-06-08: Updating end date to 2023-06-16 Status Update: Currently waiting on / working through the latest spec changes. If the changes are minimal, the only thing remaining for the async PR is integration with EVG. If the changes are substantial, we'll have to revisit the timeline for completion Sync is merged into the feature branch 2023-05-26: Setting target end date to 2023-06-02 Status Update: OIDC refactoring is done OIDC SASL mechanism in sync OIDC SASL mechanism in async in progress Evg integration is next up  

      This ticket was split from DRIVERS-2415, please see that ticket for a detailed description.

            Assignee:
            maxim.katcharov@mongodb.com Maxim Katcharov
            Reporter:
            dbeng-pm-bot PM Bot
            Votes:
            0 Vote for this issue
            Watchers:
            5 Start watching this issue

              Created:
              Updated:
              Resolved:
              13 weeks, 4 days